Monday, March 22, 2010

Doors and More

This is our septic tank. This is exciting because installing the septic is one of the last big and expensive projects. Dad and Teddy worked two days by themselves and Eric took off work on Friday to help them. Then Saturday dad pretty much got everything covered up.
We have 180 feet of leach line.

Teddy and Eric installed all the interior doors weekend before last. I learned the skill of installing door handles, which was actually quite simple. We're leaving everything natural. Stain is pretty but, we like the doors and walls just as they are.
What do we have left before we can move in? Build walk-in closet and over the washer and dryer shelving, install closet doors, run water from well to house, install hot water tank, put plywood up on ceiling of front porch, build back deck, Put insulation and plywood up in basement, poor concrete pad in front of garage, and wire kitchen and basement for electric. I'm sure there is more.....but, give us 2 months and we should be ready to move in.

1 comment: